Yarrawonga Golf Club

Central Irrigation Control system to 45 holes.
 
 

Hassall and Associates

Dubbo City Council and department of commerce Effluent re-use main, 5km 450-200 HDPE, 300mm automatic filterstation and valving.
 
 

Albury Water

5km 200mm Class 18 effluent re-use main over Nail Can Hill.
 
 

Elders Irrigation and Webster Walnuts

260Ha drip irrigation incorporating 20km 450mm to 50mm PVC pipes and Motorola control system.
 
 

Central Highlands Water

10km 300mm PN12 Gravity Main for Reuse water at Maryborough VIC
 
 

Tyco

21km main 375mm to 100mm at Colbinabbin VIC
 
 

Ellis Farms Stage 1 and 2

200Ha Tomamto Irrigation, 375mm pipes
 
 

Albury City Council

Floodplain wastewater re-use system, 90kW VSD pump station, 14 inch auto filtration plant, 500mm stainless steel manifolding, 13km PVC main and sub main pipes 375mm-100mm, 1400 Nelson rotating sprinklers, 120 000m LDPE
 
 

Albury City Council

Waterview waste water reuse system, 132kW pump station, 10 stainless steel media filters, 9km PVC pipes and 365km of drip lines.
 
 

North East Water

Pump stations at Wahgunyah, St. James, Corryong, West Wodonga, Rutherglen, Tawonga and Wangaratta.
 
 

North East Water

Rising Main at Wahgunyah.
 
 

North East Water

Bellbridge reuse irrigation system.
 
 

City of Wodonga

VSD pump station and chlorination plant to Logic Industrial Estate Barnawatha
 
 

Tyco

Supply and installation of irrigation to 150 acre olive plantation.
 
 

MRV

Supply and Installation of 1100 acres of drip irrigation to vineyard.
 
 

MRV

9km dam fill pipelines.
 
 

Department of Land and Water Conservation

Billabong Creek 45kW submersible pump installation.
 
 

Belgium seeds

6km 300mm pipeline, 450hp dielsel pump set and centre pivots.
 
 

Central Highlands Water

Pump station, filter plant, HDPE main and centre pivot to Avoca waste water plant.
 
 

GHD and Bonlac Foods

Irrigation pump station augmentation at Stanhope VIC
 
 

Great Northern

9km of trenching for PVC pipe supply
 
 

Dubbo City Council

1760 metre new rising main along the Mitchell highway connecting to a new pump station.
 
 

Howlong Golf Club

Stage 1. Upgrade of course Irrigation and telemetry with Toro satelites including re-programming.
 
 

AXEDALE WATER SUPPLY PIPELINE

Linking the town of Axedale to Bendigo mains via Junortoun. Almost 12 km’s along McIvor Hwy through private and environmentally sensitive land, great care is being taken to preserve natural bushland along the route. Pipe construction varies from 250 mm down to 100 mm PVC, 1.8 km’s of directional bores, 2 pressure reducing stations and Chlorination plant upgrade will complete this project.
 
 

Stoney Creek

Stoney Creek pipeline and associated civil works including fitment of bore pump,electrical and cross connection to existing main.
 
 

Central Highlands Water

Pump station, in line filters, HDPE main and Centre Pivot for Clunes waste water re-use plant.
 
 

Wellington Shire Council

Installation of pump station at Sale VIC
 
 

North East Water

North East Water pump stations at wahgunyah, st. james, corryong...
 
 

Central Highlands Water

Flood irrigation for wastewater re-use system at Ballan. Irrigation and tailwater pumpsets along with 720 metres 300 HDPE pipe connected to Agrinco valves to flood 24 pasture bays.
 
 

LOWER LAKES PIPELINE

Potable water supply pipeline from Narrung Peninsula to Meningie township on South Australia’s spectacular Limestone Coast. In total, 63 km’s of pipeline construction including 18km’s of 250 mm, 19,2 km’s of 200 mm, 25.8 km’s of 150 mm class 16 PVC, 225 Hydrants, 37 Isolation assemblies and 72 property tappings. This contract was completed within the Contract deadlines of October 5th and December 15th 2008.
 
 

MARYBOROUGH GROUNDWATER SUPPLY

10.7 km’s of 300 mm PVC mains installed from fresh groundwater supplies. Constructed along road reserves into Tullaroop Dam surrounds and connecting into existing line via a 3 way Dezurik Valve, therefore by passing the dam when low and ensuring Maryborough’s water supply.
 
 

Wandin Valley Farms

13km pipeline 200mm PVC Classes 20-6 including pump station.
 
 

Junee Golf Club

18 hole auto irrigation incorporating dual pump stations and 8km PN12 PVC pipes.
 
 

Copyright (c) 2009 Rainworld Irrigation. 
All rights reserved.